| 1 | EPOMS Sdn Bhd | FPSO Berantai | 18Pcs 3/4" Ball Valves |
| 2 | PBJV Group Sdn. Bhd. (HESS) | MCM-WO-B-079B1 | 6Pcs 1/2" NPTF DBB Valves & Ball Valves |
| 3 | ROC Oil (Sarawak) Sdn Bhd | D35DP-B | 4Pcs DN60-DN100, 600#-1500# DBB Valves |
| 4 | Carimin Engineering Services Sdn Bhd | Angsi Bravo (MCM21-CFIP-CP) | 8Pcs DN150, 600#-900#, Ball Valves |
| 5 | Carimin Engineering Services Sdn Bhd | Dulang Bravo (MCM21-CFIP-CP) | 4Pcs DN20-40, 900#, Ball Valves |
| 6 | PBJV Group Sdn. Bhd. (IPC) | (PBJV-HU010-179-WOP-(PBJV-HU010-179-WOP-0479(B) | 60Pcs Flange, Fittings & Studbolts |
| 7 | Dayang Enterprise Sdn Bhd (KPOC) | DE-KPOC-19-0067 | 2pcs, 3/4", 150# Ball Valves |
| 8 | Carimin Engineering Services Sdn Bhd | Dulang Bravo (MCM21-CFIP-CP) | 13Pcs DN20-40, 900#, Ball Valves |
| 9 | Carimin Engineering Services Sdn Bhd | Dulang Bravo (MCM21-CFIP-CP) | 2Pcs, 2" 900#, Check Valves |
| 10 | HHA Associates Sdn Bhd | EPOMS/035/19/TBK/019 | 300Pcs, Structure & Bolts |
| 11 | DELEUM Primera Sdn Bhd | MCM Project | 100Pcs, Flanges & Fittings |
| 12 | DELEUM Primera Sdn Bhd | MCM Project | 4"-6", 150#-900#, Ball Valves |
| 13 | PBJV Group Sdn. Bhd. (IPC) | (PBJV-HU010-179-WOP-0501(B) | 1Pcs, 1/2", 800#, Ball Valves |
| 14 | PBJV Group Sdn. Bhd. (IPC) | (PBJV-HU010-179-WOP-0501(B) | 100Pcs, Flanges, Gaskets & Studbolts |
| 15 | Carimin Engineering Services Sdn Bhd | Sepat (MCM21-CFIP-CP) | 8Pcs, DN25, 300#-600#, Gate Valves |
| 16 | PBJV Group Sdn. Bhd. (IPC) | (PBJV-HU010-179-WOP-0515 (B) | 2Pcs, Flanges |
| 17 | HHA Associates Sdn Bhd | FPSO KIKEH | Earthing Boss |
| 18 | HHA Associates Sdn Bhd | FPSO KIKEH | 35Pcs, Flanges |
| 19 | DELEUM Primera Sdn Bhd | MCM Project | 2Pcs, 6", 1500#, Ball Valves |
| 20 | HHA Associates Sdn Bhd | Sepat Cowline | 100Pcs, Studbolts & Gaskets |
| 21 | Petronas Chemical Fertilizer Kedah (PCFK) | Petronas Chemical Fertilizer Kedah (PCFK) | 1Pcs Y Strainer |
| 22 | HHA Associates Sdn Bhd | DULANG REDEVELOPMENT | 10Pcs, Pipes, Structural & Bolts |
| 23 | HHA Associates Sdn Bhd | TIONG A | 300Pcs Pipes |
| 24 | HHA Associates Sdn Bhd | LARUT A | 2Pcs, Flanges |
| 25 | Carimin Engineering Services Sdn Bhd | ANGSI DELTA (MCM21-CFIP-CP) | 31Pcs, DN25-DN100, 150#-900#, Ball Valves |
| 26 | HHA Associates Sdn Bhd | FPSO KIKEH | 300Pcs, Studbolts |
| 27 | HHA Associates Sdn Bhd | FPSO KIKEH | 7Pcs, Structural Material |
| 28 | HHA Associates Sdn Bhd | TIONG A | 2Pcs, Pipes |
| 29 | PBJV Group Sdn. Bhd. (IPC) | (PBJV-HU010-179-WOP-0560 (B) | 100Pcs, Flanges & Studbots |
| 30 | HHA Associates Sdn Bhd | FPSO KIKEH | 3Pcs, 2"-3", 150#, Globe Valves |
| 31 | HHA Associates Sdn Bhd | FPSO KIKEH | 7Pcs, Beam & Plates |
| 32 | HHA Associates | FPSO KIKEH (ANOMALIES 2023 P1/P2) | 100+ Pcs Gaskets |
| 33 | Carimin Engineering Services Sdn Bhd | MCM DULANG - YEAR 2022 - UR MATERIAL | 9Pcs 1/2", 800-900# NPTF Ball Valves |
| 34 | Dayang Enterprise Sdn Bhd | HELANG INTEGRATED PROJECT | F51 Pipes and Flanges, 900# |
| 35 | PBJV Group Sdn. Bhd. (IPC) | PMMCM 210 (ANOM-125), 211 (ANOM-123) & 215 (ANOM-093a) | 1Pcs DN15, 150#, Ball Valves |
| 36 | Dayang Enterprise Sdn Bhd | MDPP PROJECT (OR-230001083) CPOC | 1"x 1/2" 150# MONOFLANGE VALVE |
| 37 | PBJV | | FITTINGS & FLANGES |
| 38 | CESSB | WIM OVERBOARD LINE IMPROEMENT AT DULANG-A (CFIP/067B/002) | GLOBE & BALL VALVES |
| 39 | HHA | FPSO KIKEH (PO-23-00558 - SUPPLY & DELIVERY OF PIPE, BOLT & STRUCTURE TO FABRICATE & REPLACE STEP STAIRWAY, HANDRAIL NEAR ADT TANK BADLY CORRODED | FLANGES & FITTINGS |
| 40 | HHA | VISION OF SUPPLY & DELIVERY OF MATERIALS FOR LARUT JULY SHUTDOWN 2023 – VALVE | VALVE |
| 41 | CESSB | TO SUPPLY AND DELIVER OF CHECK & BALL VALVE FOR BEKOK A (CTSM/321B/001) | VALVE |
| 42 | HHA | SUPPLY & DELIVERY OF STRUCTURE FOR REPLACEMENT OF TURRET SWIVEL VERTICAL DRIVING ARM (WSR-064-O-001016-2022) | BEAM |
| 43 | CESSB | SUPPLY AND DELIVERY OF CHECK VALVE AT DULANG FLOWLINE (CFIP/060C/027) | CHECK VALVE |
| 44 | EPOMS | FPSO BERTAM (SHUTDOWN) BTM-23-00076 | BALL VALVE |
| 45 | CESSB | SUPPLY AND DELIVERY OF INTEGRAL DBB AT DULANG FLOWLINE (CFIP/060C/024) | DBB VALVE |
| 46 | CESSB | SUPPLY AND DELIVERY OF GLOBE VALVE AT DULANG FLOWLINE (CFIP/060C/025) | BALL VALVE |
| 47 | PCSB | SUPPLY & DELIVERY OF BALL, GATE, DBB & CHECK FOR SUMANDAK TA | VALVES |
| 48 | CESSB | SUPPLY & DELIVERY OF MANUAL VALVES AT DULANG ESP (CESSB/ITB/PMO/DUL/MCM/CFIP/2023/072C-003) | VALVE |
| 49 | CESSB | PROVISION TO SUPPLY & DELIVERY OF PROJECT MATERIALS FOR AUGUST ESD ANGSI 2023 PKG#1 (CTSM/2023/ANGSI/354B/001-002) | BALL VALVE |
| 50 | HHA | BALL VALVE | BALL VALVE |
| 51 | HHA | SUPPLY & DELIVERY OF VALVE (WSR-064-O-000254-2023) | BALL VALVE |
| 52 | CESSB | PROVISION TO SUPPLY AND DELIVER OF GLOBE & GATE VALVE FOR P ITEM VALVE REPLACEMENT AT ANGSI (CTSM/2023/ANGSI/349B/004-002-001) | BALL VALVE |
| 53 | PCFK | PO 3400463916 | BEAMS/ ANGLE |
| 54 | DESB | DEBO 3.0 FOR HIBISCUS PROJECT | PRESSURE RELIEF VALVE |
| 55 | PETROFAC | PO PM-P-23-4207 : PROCUREMENT AND SUPPLY OF ABS CERTIFIED STEEL PLATE (PART OF 2024 ANOMALIES BATCH 3) FOR CENDOR | ABS PLATE |
| 56 | CESSB | CONFIRMATION ORDER for CFIP-076B-007 To Purchase Isolation Valve for SCPA Unmanned | BALL VALVE |
| 57 | CESSB | PROVISION OF RIG DOWN MATERIALS (FLANGE) FOR M1DR PROJECT | FITTINGS & FLANGES |